Structural drying that finishes on a timeline, not when the instruments confirm it, leads to mold behind walls and the callbacks that follow. Our Lamy drying crew completes the program when the readings say it's done — not before.
Structural Drying is a science-driven process built on thermodynamics, psychrometrics, and equipment calibration — not fans pointed at a wet floor and checked weekly. Here's what our Lamy team brings to every structural drying project that ensures complete, documented results.
Undersized or generic dehumidification is the most common technical failure in Lamy drying projects.
Every active drying project in Lamy receives a daily psychrometric reading session: temperature, relative humidity, specific humidity, grains per pound of moisture in the air, and moisture content readings at fixed sensor points in each structural assembly. These readings are logged and provided as documentation of the drying program for your insurance claim. Drying is declared complete only when readings at all sensor points fall within the target EMC range for the material species being dried.
Wall cavity drying is where most post-loss mold in Lamy properties originates. It's where we focus.
Insurance-formatted drying documentation means faster settlement and fewer adjuster callbacks.
Here are the specific drying scenarios and assembly types our Lamy team is equipped and trained to handle.
Wall cavity drying in Lamy is standard procedure on every job where moisture mapping indicates wall system saturation.
Subfloor and hardwood drying in Lamy is species-specific and requires daily monitoring of cupping and moisture gradient.
Crawlspace saturation after a water event in Lamy often goes undetected — we include it in every below-grade moisture mapping session.
Water that migrates down from an upper floor or a roof intrusion in a Lamy property saturates ceiling drywall and the framing above it — areas that are impossible to reach with standard floor-level equipment. Our Lamy team installs ceiling injection ports and directs positive-pressure airflow through ceiling cavities, combined with LGR dehumidification of the affected room air space. Ceiling drywall that cannot be dried to target moisture content is removed — rather than left to become a mold substrate — and documented in the scope for replacement.
Large-scale commercial drying in Lamy is project-managed from day one with zone-specific reading logs.
Mold prevention is not a separate service — it's built into every Lamy structural drying program we run.


Equipment before mapping is guesswork. Mapping before equipment is science.
Based on the moisture map, our Lamy drying specialist designs an equipment layout: the number and type of LGR dehumidifiers required for the affected volume, the positioning and orientation of high-velocity air movers to create optimal airflow patterns across saturated assemblies, and the placement of cavity access ports for wall or ceiling injection drying.
Every calendar day, our Lamy technician visits your property, takes complete psychrometric readings at all sensor points and ambient measurement locations, logs the data, adjusts equipment if indicated, and reports the daily progress to you and your insurance carrier. The drying program continues until all assemblies reach their EMC target range.
When all sensor point readings fall within the target equilibrium moisture content range for the specific materials being dried, we perform a final comprehensive moisture survey of the entire affected area and issue a written drying completion report. This report is included in your insurance claim documentation and serves as your record of successful structural drying.



"The most important thing about COS Water Damage Restoration's Lamy structural drying was that they explained the readings to me every single day. I understood what the numbers meant, what the target was, and how far we were from completion. By day six I was watching the moisture content readings in our wall framing drop from 28% to 11% and understood exactly what was happening and why. That level of transparency is what you need when your home is full of drying equipment for a week."
"The thermal imaging session at the beginning was what showed us the water had migrated into a wall cavity adjacent to the flooded room that we never would have found otherwise. COS Water Damage Restoration set up wall cavity drying for that section specifically, and the final readings confirmed it came out completely dry alongside everything else. That's the kind of detail that prevents the mold problem three months later."
"We had a particularly complex drying project across three floors of a Lamy office building after an upstairs pipe event. COS Water Damage Restoration managed the zone readings, adjusted equipment as the drying progressed on different floors at different rates, and wrapped the entire building within 11 days with full documentation. That's professional-grade project management."
COS Water Damage Restoration's Lamy structural drying team serves Lamy and surrounding communities throughout NM. Daily monitoring included. Call +1-844-499-0972 to get started.
Structural drying that's done when it looks done leads to mold. Structural drying that's done when the readings confirm it leads to a genuinely recovered property. Call +1-844-499-0972 and our Lamy drying crew brings the instruments and the protocol.
📞 Call +1-844-499-0972 — Lamy Structural Drying24/7 Available · IICRC WRT Certified · Daily Readings · Lamy, NM